(svn r21959) -Change: replace longbridges with custom maximum bridge and tunnel length setting
This commit is contained in:
@@ -1113,7 +1113,8 @@ STR_CONFIG_SETTING_IMPROVEDLOAD :{LTBLUE}Use imp
|
||||
STR_CONFIG_SETTING_GRADUAL_LOADING :{LTBLUE}Load vehicles gradually: {ORANGE}{STRING1}
|
||||
STR_CONFIG_SETTING_INFLATION :{LTBLUE}Inflation: {ORANGE}{STRING1}
|
||||
STR_CONFIG_SETTING_SELECTGOODS :{LTBLUE}Deliver cargo to a station only when there is a demand: {ORANGE}{STRING1}
|
||||
STR_CONFIG_SETTING_LONGBRIDGES :{LTBLUE}Allow building very long bridges: {ORANGE}{STRING1}
|
||||
STR_CONFIG_SETTING_MAX_BRIDGE_LENGTH :{LTBLUE}Maximum bridge length: {ORANGE}{STRING1} tile{P 0:1 "" s}
|
||||
STR_CONFIG_SETTING_MAX_TUNNEL_LENGTH :{LTBLUE}Maximum tunnel length: {ORANGE}{STRING1} tile{P 0:1 "" s}
|
||||
STR_CONFIG_SETTING_RAW_INDUSTRY_CONSTRUCTION_METHOD :{LTBLUE}Manual primary industry construction method: {ORANGE}{STRING1}
|
||||
STR_CONFIG_SETTING_RAW_INDUSTRY_CONSTRUCTION_METHOD_NONE :none
|
||||
STR_CONFIG_SETTING_RAW_INDUSTRY_CONSTRUCTION_METHOD_NORMAL :as other industries
|
||||
@@ -3668,6 +3669,7 @@ STR_ERROR_MUST_DEMOLISH_TUNNEL_FIRST :{WHITE}Must dem
|
||||
STR_ERROR_ANOTHER_TUNNEL_IN_THE_WAY :{WHITE}Another tunnel in the way
|
||||
STR_ERROR_TUNNEL_THROUGH_MAP_BORDER :{WHITE}Tunnel would end out of the map
|
||||
STR_ERROR_UNABLE_TO_EXCAVATE_LAND :{WHITE}Unable to excavate land for other end of tunnel
|
||||
STR_ERROR_TUNNEL_TOO_LONG :{WHITE}... tunnel too long
|
||||
|
||||
# Object related errors
|
||||
STR_ERROR_TOO_MANY_OBJECTS :{WHITE}... too many objects
|
||||
|
||||
Reference in New Issue
Block a user