Merge branch 'chunnel' into jgrpp

This commit is contained in:
Jonathan G Rennison
2017-04-04 23:30:04 +01:00
3 changed files with 127 additions and 82 deletions

View File

@@ -5013,9 +5013,10 @@ STR_ERROR_SITE_UNSUITABLE_FOR_TUNNEL :{WHITE}Site uns
STR_ERROR_MUST_DEMOLISH_TUNNEL_FIRST :{WHITE}Must demolish tunnel first
STR_ERROR_ANOTHER_TUNNEL_IN_THE_WAY :{WHITE}Another tunnel in the way
STR_ERROR_TUNNEL_THROUGH_MAP_BORDER :{WHITE}Tunnel would end out of the map
STR_ERROR_CHUNNEL_THROUGH_MAP_BORDER :{WHITE}Tunnel under water would end out of the map
STR_ERROR_UNABLE_TO_EXCAVATE_LAND :{WHITE}Unable to excavate land for other end of tunnel
STR_ERROR_TUNNEL_TOO_LONG :{WHITE}... tunnel too long
STR_ERROR_TUNNEL_RAMP_TOO_SHORT :{WHITE}... ramp too short, tunnels under water must have a ramp at least three tiles long at both ends.
STR_ERROR_CHUNNEL_RAMP :{WHITE}... only ramp length between 5 and {NUM} tiles is allowed for tunnels under water.
STR_ERROR_TUNNEL_TOO_MANY :{WHITE}... too many tunnels
STR_ERROR_NO_DRILLING_ABOVE_CHUNNEL :{WHITE}No oil rigs allowed above underwater tunnels.
STR_ERROR_ANOTHER_TUNNEL_IN_THE_WAY_FOR_CHUNNEL :{WHITE}Three tiles are needed to pass under the other tunnel.